Project: EVA: Plating in place
All the plating is in place. She looks great! Better than great! This last visit was the most exciting yet... This is real! After years and years of dreaming this is finally happening. Slowly...
SailBlogs
Project: EVA:
Sorry about the (large) gap in our blogging. We've been busy on the project and haven't had much time to sit in front of the computer...
SailBlogs
Project: EVA: Insulation
Here you can see our temporary floor and some insulation on the keel well. Its the first layer you see which is about 32mm thick, the second layer will also be 32mm. This will give us a tremendous ...
SailBlogs
Project: EVA: Builders are building
The builder's holiday is (finally) over, and we're happily back at work. The plating is moving along and we're working on the whole keel winch setup. Our shipwright is in town and the planning of th...
SailBlogs
Project: EVA: The invisible work
Insulation, ahh insulation. I wonder if I was temporarily insane to not use spray on foam... we have been cutting and gluing for sooo long. But I don't regret it... the end result pays for the tim...